Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13633276

- Product Categories
- Friendly Links
Information Name: | Sichuan CFRP |
Published: | 2014-12-20 |
Validity: | 30000 |
Specifications: | 200 / 300g |
Quantity: | 1000000.00 |
Price Description: | |
Detailed Product Description: | Manufacturers Sales Hotline: 139-1713-0703 Chen I plant is the use of CFRP Toray (TORAY) T70012K carbon fiber raw material development and production of high-strength carbon fiber cloth. Authority of the State testing center, the performance in full compliance with the requirements of national standard grade Ⅰ. The company also developed and produced a variety of CFRP in line with national standards Ⅱ level requirements. Factory direct supplier obvious price advantage, quality assurance. Our production of CFRP for a variety of engineering needs. Our production and supporting the glue use carbon fiber. May constitute a performance of CFRP sheet enhancement system. Product performance in full compliance with national standards "reinforced concrete structure design specifications", "structural reinforcement and restoration with carbon fiber sheets"). Product Specifications: CFRP has 12K, 6K, 3K different specifications. Product Width: CFRP has 10cm, 20cm, 30cm and 50cm; also be developed according to customer requirements. Features: (1) high-strength and efficient: CFRP tensile strength exceeding 3400Mpa, elastic modulus than 240Gpa, elongation greater than 1.7%; long exchange deposit life, long operational period. (2) Construction convenient: a high strength, light weight, small thickness, good flexibility and excellent workability. (3) Scope of application: reinforcement aspect piers, slabs, beams and chimney; in many aerospace, automotive, environmental engineering, chemical, energy, transportation, construction, electronics, sports equipment and other fields has been widely used. CFRP is based on a drawings. 2, corrosion of concrete structures. 3, the actual detection of the strength of concrete. 4. "technical specification for strengthening concrete structures." CFRP construction 1, construction preparation (1), prepared using carbon fiber cloth construction materials Toray carbon fiber cloth, model 300g / m2, matching carbon fiber plastic (and repair mortar for Toray card. (2), auxiliary materials prepare special roller, scraper, angle grinder, scissors, chisels, hammers, bench scale. (3), according to safety regulations require the erection of scaffolding erection of scaffolding good height to facilitate the construction as a precondition. 2, the construction process and operational requirements (1), uninstall: Front reinforced by reinforcing members as possible to respond to uninstall (2), surface treatment; chisel to combine crisp surface layer, carbonized layer and severely corroded and cracked oil layer until completely exposed solid grassroots and restorative material will surface. repair the flat, where crack use epoxy repair. concrete surface should be polished smooth paste, paste at the corner to be chamfered and polished into a circular shape, radius of not less than 20mm. Then the concrete surface cleaning clean and dry (3), painted primer: The rubber armor, Part B rata weighed, placed in a clean container to reconcile even with a scraper to it evenly on the concrete surface, to be cured glue (Curing time depending on the scene and set the temperature to touch dry subject) and then proceed to the next step of construction. Note: tuned primer shall, within the prescribed time runs out, run out within 40min under normal circumstances (4) , leveling: concrete surface area with repair glue to fill the depression, there template joints height difference apply repair glue to fill the site to minimize the height difference (5), paste CFRP: cut to size according to the design requirements of CFRP, and if take a long time, lap length of not less than 100mm, and the location should be staggered overlapping layers. The resin impregnated want to paste evenly on the site, will have a good crop CFRP quickly paste in the design area, then use special roll sub-force direction back and forth along the CFRP rolling, extrusion bubble impregnated resin-impregnated carbon fiber cloth. CFRP not damaged when rolling. to be touch dry after that you can paste CFRP second channel, the same way After drying the pressure to be mean, at least eight hours: the first on the surface of the last layer of CFRP evenly impregnated with resin, plastic film covering. Note: fixing the ends of the lateral carbon fiber cloth (6), surface treatment remove plastic film, in CFRP plastic film and then scratch a level, rolling back and forth, so that glue to fully penetrate into the CFRP go. be touch dry rubber surface, the surface layer of cement mortar to make a protective layer. |
Admin>>>
You are the 5620 visitor
Copyright © GuangDong ICP No. 10089450, Hai Kang letter Construction Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5620 visitor
Copyright © GuangDong ICP No. 10089450, Hai Kang letter Construction Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility